Contractor Works UK | Construction & Project Delivery
St Peter's Health Centre | Complex Project Takeover & Completion
The Shore Group took over and completed the remaining works at St Peter’s Medical Centre, Brighton following the insolvency of the previous contractor, ensuring minimal disruption to project delivery and programme.
4 mins

AT A GLANCE
Location
PROJECT VALUE
Start Date
The Shore Group seamlessly took over and completed the remaining works at St Peter’s Medical Centre, Brighton following the insolvency of the previous contractor, ensuring minimal disruption to project delivery and programme.
TAKING OVER A COMPLEX HEALTHCARE PROJECT
When the previous contractor working on St Peter’s Health Centre became insolvent part-way through the development, Shore Construction was appointed to take over and complete the outstanding works.
The team inherited a partially completed four-storey building with multiple work packages at different stages of completion. Shore’s role was to establish the status of the existing works, coordinate the remaining trades and specialist contractors, and create a clear route through to completion.
Located on Oxford Street in central Brighton, the project also presented significant logistical challenges, with narrow surrounding streets, limited storage and restricted space for deliveries and vehicle movements. Existing healthcare services needed to remain operational throughout the redevelopment.
Shore took control of the inherited construction programme, coordinating the remaining building envelope, M&E services, internal fit-out and external works.
PROJECT SCOPE
The new St Peter’s Health Centre replaced the existing medical centre with a larger, modern primary healthcare facility designed to increase the capacity and range of services available locally.
The completed centre incorporates 16 consulting rooms, four treatment rooms, six interview rooms and a group room, supported by patient waiting areas, staff and administration facilities, meeting rooms, storage, changing and shower facilities and a roof terrace.
The development also provides accommodation for an NHS Foundation Trust, approximately 109m² for a proposed pharmacy, 12 parking spaces and 30 cycle spaces.
The completed building was required to achieve BREEAM Excellent, adding further environmental performance requirements to the technical delivery of the project.
BUILDING ENVELOPE & EXTERNAL WORKS
Shore Construction completed the remaining external envelope and coordinated previously started packages to create a finished, weather-tight building.
The scope included zinc roofing and cladding, flat roofing, sedum roofing, slated roof areas, brick façades, windows and external doors, together with rainwater goods, roof-access systems and lightning protection.
Shore also coordinated the remaining hard and soft landscaping to complete the external areas.
MECHANICAL & ELECTRICAL
The remaining works extended across the building’s mechanical and electrical systems.
Shore coordinated lighting, electrical power, communications, fire alarm systems, ventilation, air conditioning and heating, integrating the services with partitions, ceilings, doors, fitted furniture and individual room requirements.
Life-safety systems and fire stopping also had to be carefully coordinated around existing and newly completed installations.
INTERNAL FIT-OUT
Internally, Shore completed an extensive package of architectural and finishing works, including doors and carpentry, flooring, fitted furniture and kitchens, decorations, fire stopping, partitions and ceilings, sanitary facilities and the reception desk.
Careful sequencing between trades was essential. Services and partitions needed to align before ceilings could be completed, while flooring, decorations, joinery, sanitary installations and fitted furniture followed through the programme to create the finished clinical spaces.
WORKING AROUND LIVE HEALTHCARE SERVICES
The development was phased so the existing medical practice could remain operational while construction progressed.
Working alongside live healthcare services required careful management of construction activity, access, deliveries and site logistics. The constrained Oxford Street location meant materials, waste removal and contractor movements had to be closely coordinated with the programme.
The project also required the relocation of a UKPN substation before groundworks could progress, adding another significant infrastructure and sequencing requirement.
DELIVERY BENEFITS
PROJECT RECOVERY
Main Contractor responsibility for a partially completed healthcare development, establishing a clear route through to completion.
MULTI-TRADE DELIVERY
Coordinated completion of the building envelope, M&E services, internal fit-out and external works within a single programme.
LIVE ENVIRONMENT
Phased delivery allowed healthcare provision to continue while the remaining construction works progressed.
COMPLEX LOGISTICS
Careful coordination of trades, materials and deliveries on a constrained city-centre site with limited storage and access.
LOCAL SUPPLY CHAIN
Local trades and subcontractors, including carpenters, electricians, plumbers, labourers, painters and decorators, supported delivery of the remaining works.
St Peter’s Health Centre demonstrates Shore Construction’s ability to step into a complex project, take ownership and provide the construction management, technical coordination and multi-trade capability needed to get it finished.
CASE STUDIES




